M/V BERING DELIVERED THE DRILLING RIG FOR THE ARCTIC LNG2 PROJECT TO THE PORT OF ARKHANGELSK

M/V BERING DELIVERED THE DRILLING RIG FOR THE ARCTIC LNG2 PROJECT TO THE PORT OF ARKHANGELSK

The m/v Bering has successfully delivered the drilling rig for the Arctic LNG2 project to the port of Arkhangelsk (TLC Solombala Terminal).
M/V BERING DELIVERED THE DRILLING RIG FOR THE ARCTIC LNG2 PROJECT TO THE PORT OF ARKHANGELSK

Back to the list